Project Information
The Range Store is building a new HQ in Plymouth, together with some retail units. To service these, a new multi-storey car park is being built and CPC, using Deckmaster System R was selected.
Project Scope
This was a fast-track job, installed onto one week old concrete using Deckmaster DPM Primer.
Although installed in January, the coldest and wettest month of the year, the system was installed successfully with little downtime.
There are systems available that can be installed in very cold conditions, such as methyl methacrylate based systems, but colder conditions mean wetter decks – which actually causes more problems than temperature. Deckmaster System R was installed without problem.